January 2025 – completion of work on the construction of a peak and reserve natural gas boiler with a capacity of 150 Mg/h of steam. The work included the scope of General Designer for the entire investment, interdisciplinary coordination, author’s supervision, and the preparation of basic, detailed, as-built, and construction designs. The facility was commissioned and achieved the assumed design parameters.