<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Documentation &#8211; Nobo Solutions Sp. z o.o.</title>
	<atom:link href="https://www.nobosolutions.com/en/tag/documentation/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.nobosolutions.com/en/</link>
	<description>Prace badawczo-rozwojowe, projektowanie, analizy i doradztwo</description>
	<lastBuildDate>Wed, 15 Oct 2025 11:15:49 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0.4</generator>

<image>
	<url>https://www.nobosolutions.com/wp-content/uploads/2017/03/logo_nobo_ikona-150x150.png</url>
	<title>Documentation &#8211; Nobo Solutions Sp. z o.o.</title>
	<link>https://www.nobosolutions.com/en/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>General Designer 2025</title>
		<link>https://www.nobosolutions.com/en/general-designer-2025/</link>
		
		<dc:creator><![CDATA[Administrator]]></dc:creator>
		<pubDate>Fri, 14 Feb 2025 12:12:00 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[AutoPIPE]]></category>
		<category><![CDATA[Design]]></category>
		<category><![CDATA[Documentation]]></category>
		<category><![CDATA[General Designer]]></category>
		<guid isPermaLink="false">https://www.nobosolutions.com/?p=3957</guid>

					<description><![CDATA[January 2025 – completion of work on the construction of a peak and reserve natural gas boiler with a capacity of 150 Mg/h of steam. The work included the scope of General Designer for the entire investment, interdisciplinary coordination, author&#8217;s supervision, and the preparation of basic, detailed, as-built, and construction designs. The facility was commissioned [&#8230;]]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">January 2025 – completion of work on the construction of a peak and reserve natural gas boiler with a capacity of 150 Mg/h of steam. The work included the scope of General Designer for the entire investment, interdisciplinary coordination, author&#8217;s supervision, and the preparation of basic, detailed, as-built, and construction designs. The facility was commissioned and achieved the assumed design parameters.</p>



<p class="wp-block-paragraph"></p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
